Project Proposal for Urjadata Solar Green Bonds

1. Executive Summary

The Urjadata Green Bonds – PMKUSUM Solar Power Plant Initiative is a pioneering solar energy project under India’s PMKUSUM Component A & C(FLS) scheme. This initiative aims to promote grid connected Feeder Level Solarization and decentralized solar power generation on agricultural and barren land, thereby contributing to India’s renewable energy targets and reducing its dependence on fossil fuels. Urjadata seeks to raise ₹16 crore through the issuance of green bonds, which will exclusively fund two grid connected solar power plants with a combined capacity of (2×2) 4 MW in Madhya Pradesh.

With a 15-year tenure and a 7% annual coupon rate, the bonds offer stable returns for investors, backed by government subsidies and attractive tax benefits. The project is designed to reduce carbon emissions by 3,500 tons per year and generate (4+4) 8 million kWh of renewable energy annually. By supporting this initiative, investors will play a crucial role in accelerating India’s transition to a sustainable energy future while enjoying the financial benefits of a secure investment.

Key Highlights:

Total Funding: ₹16 crore via Green Bonds

Capacity: (2×2) 4 MW Solar Power Plants

Annual Coupon Rate: 7%

Tenure: 15 years

Environmental Impact: 3,500 tons of CO2 emissions reduced annually

Location: Sagar, Madhya Pradesh, 470226, India

This solar power project not only supports India’s clean energy goals but also provides investors with a unique opportunity to contribute to environmental sustainability while earning competitive returns.

 2. Detailed Project Description

The Urjadata Green Bonds – PMKUSUM Solar Power Plant Initiative is part of the Government of India’s ambitious PMKUSUM scheme, which aims to accelerate the adoption of decentralized renewable energy projects across the country. This initiative will fund the construction of two solar power plants in Madhya Pradesh, each with a capacity of 2 MW, resulting in a total installed capacity of 4 MW. These plants will be located on barren and agricultural lands, making efficient use of land that would otherwise remain less productive or unproductive.

Project 1 Docs Link – LOA No: 4957 (2 MW):

Project Registration Approval Doc Link: MPNRE/Solar/Pvt. MPPMCL/Kusum-A/22

Project Location Map Link: Latitude 23.289817, Longitude 79.001321

Power Purchase Agreement PPA Doc Link: No./05-01/Solar/KA-03/83

MPUVNL RFP Doc Link: MPUVN/KUSUM-A/2020-21/2906

Land Details: Patwari Halka Number 62, Khasra No 49, covering an area of 7.1 acres.

Project 2 Docs Link – LOA No: 4923 (2 MW):

Project Registration Approval Doc Link: MPNRE/Solar/Pvt. MPPMCL/Kusum/2 

Project Location Map Link: Latitude 23.292177, Longitude 78.992227

Power Purchase Agreement PPA Doc Link: No./05-01/Solar/KA-20/85

MPUVNL RFP Doc Link: MPUVN/KUSUM-A/2021-22/315

Land Details: Patwari Halka Number 62, Khasra No 67/2, covering an area of 6.6 acres.

Both solar power plants will be connected to the grid through dedicated transmission lines, ensuring a stable supply of renewable energy to the local Maharajpur (Deori, Sagar, 470226)  substation distribution network. These projects are being implemented in collaboration with the Madhya Pradesh Power Management Company Limited (MPPMCL) under established Power Purchase Agreements (PPAs). The generated solar energy will be sold to DISCOM MPPMCL at pre-agreed tariffs (3.07/kWh) , contributing to the state’s energy security and reducing reliance on fossil fuels.

Key Objectives:

The objective of providing energy and water security to farmers, enhance their income, de-dieselise the farm sector and reduce environmental pollution. Reducing the agriculture electricity subsidy burden on states and improving the financial health of DISCOMS. Curbing climate change and day-time reliable power for irrigation. Reducing rhe import bills. The solar power purchased under this component will also help the DISCOMs to meet their Renewable Energy Purchase Obligation (RPO) target.

Decentralized Solar Power Generation: The project will support decentralized renewable energy generation by utilizing farmer-owned land for the installation of solar power plants.

Carbon Emission Reductions: This initiative will significantly reduce greenhouse gas emissions, helping India meet its climate change mitigation goals.

Energy Independence: The solar plants will contribute to India’s energy security by reducing dependence on imported fossil fuels and increasing the share of renewable energy in the national grid.

Rural Employment: By establishing solar power plants in rural areas, the project will create job opportunities and promote economic development.

Financial Support for Farmers: Farmers leasing their land for solar power plants will benefit from additional income streams, making this initiative a win-win for both the environment and the rural economy.

Environmental Impact:

The combined 4 MW capacity of these two solar power plants is projected to generate 8,000,000 kWh of renewable energy annually, offsetting approximately 3,500 tons of carbon dioxide emissions per year. In addition to reducing carbon emissions, the project will also improve air quality by lowering emissions of harmful pollutants, including 40 tons of sulfur dioxide and 80 tons of nitrogen oxides annually.

This initiative aligns with India’s renewable energy goals under the Paris Agreement and contributes to the country’s efforts to combat climate change. Long-term environmental benefits include reduced fossil fuel consumption, protection of ecosystems, and improved public health through cleaner air.

3. Financial Overview

The Urjadata Green Bonds – PMKUSUM Solar Power Plant Initiative is designed with a robust financial structure that balances sustainability with financial returns. This section outlines the bond issuance details, the allocation of proceeds, and the various financial incentives and benefits available to investors.

Bond Issuance Amount:

Urjadata plans to raise ₹16 crore through the issuance of green bonds. These funds will be used exclusively to finance the construction and installation of two solar power plants, each with a capacity of 2 MW, resulting in a total installed capacity of 4 MW.

Tenure:

The bond has a 15-year tenure, providing investors with a long-term, stable income stream. This extended duration aligns with the lifecycle of the solar power plants, ensuring consistent returns over time.

Coupon Rate:

The bonds offer an attractive 7% annual coupon rate, providing competitive returns in the green investment sector. This stable interest rate makes the bonds an appealing choice for investors looking for a secure and sustainable investment opportunity.

Use of Proceeds:

The proceeds from the bond issuance will be exclusively allocated to the installation of grid connected solar power plants under the PMKUSUM Component A & C(FLS) project. No funds will be diverted to non-project-related activities, ensuring that all capital is directly invested in the development of renewable energy infrastructure.

Subsidies and Incentives:

The PMKUSUM Component A & C(FLS) project is supported by several government subsidies and incentives, which enhance the financial viability of the project:

Capital Subsidy: The Government of India provides a capital subsidy covering 30% of the total project cost, reducing the initial financial burden on the project and improving the overall return on investment.

Interest Subsidy: Interest subsidies are available for loans taken to finance the project, further improving the project’s financial outlook.

Tax Benefits: Investors in these green bonds are eligible for tax benefits, making this a tax-efficient investment. These benefits, combined with the competitive coupon rate, enhance the overall attractiveness of the bonds.

Investor Benefits:

Stable Returns: With a 7% annual interest rate and a 15-year tenure, investors can expect consistent, long-term returns.

Government Support: The project is backed by government subsidies and incentives, reducing financial risks and ensuring the success of the project.

Tax Advantages: The tax benefits associated with green bond and Statup India Initiative investments make this a financially prudent choice for investors looking to optimize their returns.

Environmental Impact: In addition to financial returns, investors will contribute to India’s renewable energy transition and climate action goals, making this investment socially responsible.

The combination of financial stability, government support, and tax benefits makes the Urjadata Green Bonds an attractive investment opportunity for individuals and institutions looking to invest in sustainable projects with reliable returns.

4. Risk Management

Effective risk management is crucial to the success of the Urjadata Green Bonds – PMKUSUM Solar Power Plant Initiative. This section outlines the key risks associated with the project and the mitigation strategies that will be employed to ensure the project’s stability and the security of investor returns.

a) Environmental Risk

Risk:

The performance of solar power plants can be affected by environmental factors such as weather conditions, natural disasters, and changes in climate patterns. For example, prolonged periods of cloud cover or reduced sunlight could impact the energy output of the solar panels.

Mitigation Strategy:

Climate Resilient Design: The solar power plants are designed to be resilient to local climate conditions, with solar panels optimized for high efficiency even in varying weather conditions.

Regular Monitoring: Continuous monitoring of environmental factors will be implemented to ensure that the plants operate at optimal performance levels. Advanced weather forecasting and performance tracking systems will be used to anticipate and mitigate any potential disruptions.

Insurance: Comprehensive insurance coverage will be obtained to protect against potential losses from environmental risks, including damage from extreme weather events.

b) Financial Risk

Risk:

Financial risks include the possibility of cost overruns during construction, delays in project completion, or fluctuations in the costs of materials and labor. Additionally, changes in government policies or energy tariffs could impact the financial performance of the project.

Mitigation Strategy:

Government Support: The project benefits from strong government support, including capital subsidies and interest subsidies, which reduce the financial burden and enhance project viability. These incentives mitigate the risk of cost overruns by providing financial cushioning.

Fixed Tariffs: The Power Purchase Agreements (PPAs) with the Madhya Pradesh Power Management Company Limited (MPPMCL) ensure fixed tariffs for the energy generated, providing predictable revenue streams over the life of the project.

Budget Contingencies: A contingency budget has been set aside to cover unforeseen costs, ensuring that the project remains financially stable throughout its implementation.

c) Market Risk

Risk:

Market risks include fluctuations in the demand for renewable energy, changes in electricity prices, and competition from other renewable energy projects. These factors could impact the project’s profitability and the long-term stability of returns.

Mitigation Strategy:

Growing Renewable Energy Demand: The demand for renewable energy in India is expected to continue growing due to national policies focused on reducing carbon emissions and increasing the share of renewable energy in the energy mix. This growing demand reduces market risk by ensuring a strong market for solar energy.

25 Years Long-Term PPAs: The long-term PPAs signed with MPPMCL guarantee a steady demand for the energy generated by the solar power plants, minimizing exposure to market volatility.

Diversified Energy Mix: By focusing on renewable energy, the project is aligned with India’s long-term energy goals, making it resilient to market changes that might affect traditional energy sources.

d) Operational Risk

Risk:

Operational risks include the potential for equipment failure, maintenance issues, and disruptions in the power generation process. These risks could result in reduced energy output and affect the project’s revenue generation.

Mitigation Strategy:

High-Quality Equipment: The solar power plants will utilize high-quality solar panels and related equipment from reputable manufacturers to minimize the risk of operational failures.

Preventive Maintenance: A preventive maintenance schedule will be implemented to keep the solar panels and associated infrastructure in optimal condition, reducing the likelihood of unexpected downtime.

Ongoing Training: The operations team will receive ongoing training to ensure they are equipped to manage the solar plants efficiently and address any technical issues promptly.

e) Regulatory Risk

Risk:

Changes in government policies, regulations, or energy tariffs could impact the project’s operations, costs, or profitability. Regulatory risks are particularly relevant in the renewable energy sector, where policies can evolve in response to political and economic changes.

Mitigation Strategy:

Government Alignment: The PMKUSUM scheme is a key part of the Government of India’s renewable energy strategy, making it a priority for policymakers. This alignment with national energy goals reduces the likelihood of negative regulatory changes.

Continuous Compliance Monitoring: The project team will continuously monitor regulatory developments and maintain compliance with all relevant standards, including those set by the Madhya Pradesh Electricity Regulatory Commission (MPERC), Central Electricity Authority (CEA), and other authorities. Any changes in policy will be proactively managed to ensure minimal impact on the project.

Conclusion

By implementing these comprehensive risk management strategies, the Urjadata Green Bonds – PMKUSUM Solar Power Plant Initiative is positioned to mitigate potential risks effectively, ensuring project stability and protecting investor returns. With a strong focus on environmental resilience, financial safeguards, and market alignment, this project offers a secure investment opportunity in India’s growing renewable energy sector.

5. Investor Benefits

The PMKUSUM Green Bonds – Urjadata Solar Power Plant Initiative offers a range of compelling benefits to investors, combining stable financial returns with the opportunity to support India’s transition to a sustainable energy future. This section outlines the key advantages that make these green bonds an attractive investment option for individuals and institutions.

a) Stable Returns

7% Annual Coupon Rate: Investors will receive a competitive annual return of 7%, which provides a steady income stream over the 15-year tenure of the bond. This fixed interest rate offers predictability, making the bonds a reliable investment in the context of fluctuating market conditions.

Long-Term Security: The 15-year bond tenure aligns with the lifecycle of the solar power plants, ensuring that investors benefit from long-term stability. The steady returns make these bonds particularly attractive for institutional investors, such as pension funds, seeking secure, long-term investments.

b) Government Support

Backed by Subsidies: The PMKUSUM project benefits from substantial government support, including a 30% capital subsidy and interest subsidies on loans. These subsidies reduce the financial risks associated with the project, making the bonds a safer investment.

Favorable Tariffs: The energy generated by the solar power plants is sold to the Madhya Pradesh Power Management Company Limited (MPPMCL) at pre-agreed tariffs under long-term Power Purchase Agreements (PPAs). This ensures a consistent revenue stream for the project, further securing investor returns.

c) Tax Benefits

Tax Efficiency: Investors in the PMKUSUM Green Bonds will benefit from tax incentives that enhance the overall financial appeal of the investment. These tax benefits can significantly improve the net returns for investors, making the bonds a financially smart choice for those seeking both income and tax savings.

d) Social Responsibility

Sustainable Investment: By investing in these green bonds, investors are actively contributing to the growth of renewable energy in India. The project is projected to reduce carbon dioxide emissions by 3,000 tons per year and generate 4 million kWh of clean energy annually. This aligns with global climate goals and supports India’s commitments under the Paris Agreement.

Environmental Impact: Beyond financial returns, investors can take pride in knowing their investment directly contributes to reducing carbon emissions, improving air quality, and supporting the development of sustainable energy infrastructure in rural India.

e) Portfolio Diversification

Green Investment Opportunities: Green bonds offer an excellent opportunity for investors to diversify their portfolios by adding environmentally focused investments. This diversification can balance risks associated with traditional asset classes, such as stocks and conventional bonds, and provide exposure to the rapidly growing renewable energy sector.

Low Correlation with Market Volatility: Investments in infrastructure projects, like solar power plants, tend to have lower correlations with broader market volatility, making green bonds a stable addition to a diversified investment portfolio.

f) Contribution to National Goals

Supporting India’s Renewable Energy Targets: By investing in the PMKUSUM Green Bonds, investors are contributing to India’s national renewable energy goals. The project supports the Government of India’s initiatives to reduce reliance on fossil fuels and increase the share of renewable energy in the country’s energy mix.

Job Creation and Rural Development: The project also has a positive social impact by creating jobs in rural areas and providing farmers with new income streams through land leasing for solar installations. This not only supports local economies but also contributes to India’s broader economic development goals.

Conclusion

The Urjadata Green Bonds – PMKUSUM Solar Power Plant Initiative offers a unique combination of financial returns, government support, tax efficiency, and positive environmental and social impact. Investors will benefit from stable, long-term returns while playing an active role in India’s renewable energy transition. These bonds are an ideal choice for those seeking secure, sustainable, and socially responsible investment opportunities.

6. Reporting and Compliance

Ensuring transparency and compliance is crucial to maintaining investor confidence and upholding the integrity of The Urjadata Green Bonds – PMKUSUM Solar Power Plant Initiative. This section details the reporting and compliance measures that will be implemented to guarantee that the bond proceeds are used as intended and that the project adheres to the highest environmental and financial standards.

a) Green Bond Certification

Third-Party Certification: To ensure that The Urjadata Green Bonds – PMKUSUM Solar Power Plant Initiative meets international green bond standards, the bonds will be certified by a recognized third-party verifier. This certification will confirm that the funds raised are being used exclusively for environmentally sustainable projects, in accordance with the Green Bond Principles (GBP).  

Compliance with Green Standards: The certification process will involve a thorough review of the project’s environmental impact, including its contributions to reducing carbon emissions and generating renewable energy. This independent verification will enhance the credibility of the bonds and attract socially responsible investors.

b) Use of Proceeds Reporting

Allocation Report: An annual allocation report will be provided to investors, detailing how the proceeds from the bond issuance have been allocated to the solar power plants. This report will ensure full transparency and demonstrate that all funds are being used in accordance with the stated objectives of the project.  

Tracking of Proceeds: Urjadata will implement a robust tracking system to monitor the use of proceeds, ensuring that every rupee raised through the green bonds is directed towards the development of the solar power plants. This tracking will be in line with the guidelines set by the Madhya Pradesh Electricity Regulatory Commission (MPERC) and other relevant authorities.

c) Impact Reporting

Environmental Impact Report: In addition to financial reporting, Urjadata will provide regular environmental impact reports. These reports will quantify the environmental benefits achieved by the project, such as reductions in carbon emissions and the amount of renewable energy generated. This will allow investors to see the tangible positive impact of their investment on the environment.  

Key Metrics: The impact reports will include key performance indicators (KPIs) such as:

Carbon Dioxide Emissions Reduced: Approximately 3,000 tons of CO2 avoided annually.

Renewable Energy Generated: An estimated 4 million kWh of clean energy produced each year.

Air Quality Improvements: Reduction in pollutants like sulfur dioxide and nitrogen oxides.

d) Compliance with Regulatory Standards

Regulatory Compliance: Urjadata is committed to ensuring that the solar power plants operate in full compliance with all relevant regulatory standards, including those set by the Central Electricity Authority (CEA), MPERC, and DISCOM utility practices. This will include adherence to safety standards, environmental regulations, and energy production guidelines.  

Periodic Audits: The project will undergo periodic audits to verify that the bond proceeds are being used in accordance with the green bond framework and that the environmental impact aligns with the project’s stated goals. These audits will be conducted by independent third parties to ensure impartiality and transparency.

e) Investor Communication

Ongoing Updates: Investors will receive regular updates on the progress of the solar power plants, including both financial and environmental performance. These updates will ensure that investors are well-informed about the project’s development and impact.  

Dedicated Investor Portal: Urjadata will provide a dedicated investor portal where bondholders can access detailed reports, updates, and any other relevant information about the project. This portal will facilitate seamless communication between Urjadata and its investors, ensuring that all stakeholders remain engaged and informed.

Conclusion

Through rigorous reporting and compliance measures, The Urjadata Green Bonds – PMKUSUM Solar Power Plant Initiative will maintain transparency and accountability at every stage of the project. These efforts will ensure that investors can trust that their capital is being used effectively to support renewable energy development, while also contributing to meaningful environmental and social impact.

keyboard_arrow_up